Command Center
Real-time operational view of Central San's asset base. 5019 Imhoff Place, Martinez · 145 sq mi service area · 54 MGD plant · 1,500 mi collection · Wet weather peak 240 MGD.
Total Assets Tracked
14,247
Operational Health
94.2%
Open Work Orders
312
CIP Projects Active
34
Priority Alerts
CRITICAL
WHB #2 steam boiler tube RFT test due — MHF Incinerator line scheduled outage Apr 22
2h ago
CRITICAL
Orinda Crossroads PS — VFD #2 over-temp trip, 3 events in 48h (pattern detected)
4h ago
HIGH
Aeration Basin #3 diffuser DO transfer efficiency -11% vs baseline — DP 100061 scope validation needed
6h ago
HIGH
Secondary Clarifier #3 — drive torque trending +18% over 14d rolling avg, mechanism inspection recommended
11h ago
MEDIUM
Electrical Sub 55 (DP 100040) — commissioning readiness at 76%, ATS burn-in pending
14h ago
MEDIUM
Clayton PS — pump #1 bearing vibration +22% above ISO 10816 threshold, lubrication check scheduled
18h ago
Asset Risk Pyramid
Criticality-weighted risk model: probability of failure × consequence of failure, grouped by asset class. Treatment Plant + Collection System.
Asset Portfolio Overview
High-level health, risk, and financial summary across all 14,247 assets. Central San · Martinez WWTP + 145 sq mi service area.
Total Asset Value (RAV)
$2.4B
Replacement asset value
Avg Asset Age
18.3 yr
Weighted by criticality
Assets in CIP Pipeline
847
Across 34 active projects
Maintenance Backlog
$14.2M
Deferred maintenance index
NPDES Compliance
27 yr
Unbroken Platinum Peak
Predictive Alerts (30d)
143
Generated by agent stack
Asset Distribution by Class
| Asset Class | Count | Avg Condition | Avg Age | Risk Score | Open WOs |
|---|---|---|---|---|---|
| Rotating Equipment | 2,841 | Fair | 16.4 yr | 87 | 48 |
| Force Mains & Pipes | 3,204 | Fair | 24.1 yr | 82 | 31 |
| Cogeneration / Boilers | 312 | Fair | 19.7 yr | 78 | 22 |
| Solids / MHF | 648 | Good | 12.3 yr | 67 | 19 |
| Electrical MV | 934 | Good | 11.2 yr | 61 | 27 |
| UV / Disinfection | 287 | Good | 9.8 yr | 44 | 14 |
| Collection System | 4,821 | Good | 31.2 yr | 38 | 67 |
| Instrumentation / Lab | 1,200 | Good | 8.4 yr | 24 | 41 |
Asset Registry
14,247 assets across 68 classes. Treatment Plant · Collection System · Pumping Stations · Recycled Water · HHW · Cogeneration.
| Asset ID | Name | Class | Location | Condition | Lifecycle | Last Inspected | Risk |
|---|---|---|---|---|---|---|---|
| TP-SMF-WHB-002 | WHB #2 Steam Boiler | Cogen / Boiler | Martinez WWTP · MHF | Poor | 71% | 2026-03-14 | 87 |
| CS-PS-ORC-VFD-002 | Orinda Crossroads VFD #2 | Rotating Equip | Orinda Crossroads PS | Critical | 38% | 2026-04-02 | 91 |
| TP-BIO-AB-003 | Aeration Basin #3 Diffuser | Process Equipment | Martinez WWTP · Bio | Fair | 64% | 2026-02-28 | 62 |
| TP-BIO-SC-003 | Secondary Clarifier #3 | Rotating Equip | Martinez WWTP · Bio | Fair | 57% | 2026-03-22 | 74 |
| TP-ELEC-SUB-055 | Electrical Substation 55 | Electrical MV | Martinez WWTP · Elec | Good | 92% | 2026-04-10 | 31 |
| CS-PS-CLT-PMP-001 | Clayton PS Pump #1 | Rotating Equip | Clayton PS | Fair | 61% | 2026-03-31 | 68 |
| RW-FILT-MBR-001 | Recycled Water MBR #1 | Membrane / Filtration | Recycled Water Plant | Good | 84% | 2026-04-01 | 29 |
| TP-COG-GT-001 | Cogeneration Gas Turbine #1 | Cogen / Boiler | Martinez WWTP · Cogen | Fair | 54% | 2026-01-18 | 79 |
Work Orders
312 open work orders · 18 critical · Auto-generated and triaged by Agent Stack.
WHB #2 Boiler — RFT inspection before Apr 22 outage
WO-2026-0847 · TP-SMF-WHB-002 · Assigned: Maintenance Team A · Due: Apr 20
Open
Orinda Crossroads PS — VFD #2 thermal inspection + replacement evaluation
WO-2026-0851 · CS-PS-ORC-VFD-002 · Assigned: Electrical Team · Due: Apr 18
In Progress
Aeration Basin #3 — Diffuser membrane inspection, DO efficiency scope
WO-2026-0838 · TP-BIO-AB-003 · Linked: DP 100061 · Due: Apr 25
Open
Secondary Clarifier #3 — Drive mechanism inspection, torque measurement
WO-2026-0822 · TP-BIO-SC-003 · Assigned: Mechanical Team · Due: Apr 28
Open
Electrical Sub 55 — ATS burn-in test, commissioning validation
WO-2026-0856 · TP-ELEC-SUB-055 · DP 100040 · Due: May 3
Review
Clayton PS Pump #1 — Bearing lubrication, vibration baseline
WO-2026-0801 · CS-PS-CLT-PMP-001 · Assigned: Mechanical Team · Due: Apr 22
In Progress
Annual NASSCO PACP assessment — Martinez WWTP collection laterals (Zone 3)
WO-2026-0744 · Zone 3 Collection · Assigned: Field Inspection · Due: May 15
Open
MBR Recycled Water Plant — Annual membrane integrity test
WO-2026-0812 · RW-FILT-MBR-001 · Compliance requirement · Due: Jun 1
Open
Agent Stack
11 specialized AI agents orchestrated by AIOC. Each agent has a narrow domain, defined toolset, and ISO 55000-aligned decision logic.
Lifecycle Agent
Asset lifecycle tracking & EOL planning
Active
· 2 alerts generated today
14,247
Assets
412
EOL <5yr
71%
Avg Life
Condition Agent
Sensor data, inspections, condition scoring
Active
· Monitoring 826 flagged assets
826
Flagged
94.2%
Fleet Health
12min
Refresh
Performance Agent
KPI tracking, efficiency analysis, baseline delta
Active
· 1 efficiency anomaly flagged
143
KPIs
7
Anomalies
30d
Window
Predictive Agent
Failure prediction, vibration+torque models
Active
· 2 failure forecasts pending
312
Models
89%
Accuracy
90d
Horizon
Compliance Agent
NPDES, permit tracking, regulatory reporting
Active
· All permits current
27yr
Streak
14
Permits
0
Violations
CIP Agent
$980M capital program, commissioning, DP tracking
Active
· 2 projects commissioning
34
Active
92
Line Items
$980M
Total
Work Order Agent
WO generation, triage, scheduling
Active
· 312 active WOs managed
312
Open
18
Critical
4.2d
Avg Close
Risk Agent
Risk scoring, failure probability × consequence
Active
· Risk pyramid updated
9
Classes
ISO
31000
Live
Update
Knowledge Agent
Standards corpus, ISO/WEF/AWWA/NASSCO
Idle
· Last query 2h ago
9
Standards
2,400
Docs
RAG
Engine
Regulatory Agent
Permit deadlines, auditor response, GASB 34
Active
· 3 upcoming deadlines
14
Permits
24hr
Response
GASB
34
Vision Agent
Apple Vision Pro spatial UI, AR inspection
Standby
· visionOS ready
AR
Overlay
3D
Models
vOS
Platform
Tools & Integrations
Enterprise systems connected to the Asset Manager Agent Stack. EAM, SCADA, GIS, BIM, and operational data feeds.
EAM / CMMS
Enterprise Asset Management
Work order management, asset registry, PM scheduling, maintenance history.
Connected · 14,247 assets synced
SCADA / PI Historian
Sensor & Process Data
Real-time process data, historian trends, alarm management, OT integration.
Live · 4,200+ data points
GIS / Esri ArcGIS
Geospatial Intelligence
Asset spatial mapping, collection system routing, inspection zone management.
Connected · 1,500 mi mapped
BIM / Autodesk
Building Information Model
3D facility models for Martinez WWTP, pumping stations, recycled water plant.
Partial · WWTP modeled
ERP / Financial
GASB 34 Financial Reporting
Capital asset accounting, depreciation schedules, GASB 34 infrastructure reporting.
Connected · $2.4B RAV tracked
LIMS
Laboratory Information Management
Water quality data, NPDES permit compliance sampling, effluent reporting.
Connected · NPDES compliant
Mobile Field App
Field Inspection & WO
iOS/Android app for field teams. Work order execution, inspection forms, photo capture.
Active · 24 field users
NASSCO Pipeline Inspector
Collection System Assessment
PACP/MACP/LACP defect coding for 1,500 miles of gravity sewer and force mains.
Scheduled · Zone 3 pending
Apple Vision Pro
Spatial Computing Interface
AR overlays on physical assets, spatial dashboards, hands-free inspection workflow.
Standby · visionOS 2.4
Knowledge Base
Standards corpus powering agent decisions. ISO, EPA, AWWA, WEF, NASSCO, SMRP, GASB — 2,400+ reference documents.
ISO 55000 / 55001 / 55002
Asset Management System Requirements
2024 edition. Core framework for organizational asset management systems. Drives Lifecycle and Risk Agents.
ISO 14224
Equipment Reliability & Taxonomy
Equipment data collection, reliability and maintenance data for oil & gas adapted to water utility. Drives Condition Agent.
ISO 31000
Risk Management Framework
Principles and guidelines for risk management. Foundation of the Risk Agent's probability × consequence scoring model.
EPA Asset Management Primer
US Water Utility Framework (2017)
EPA's five-core-question framework for water/wastewater asset management. Aligns with Central San's SSMP requirements.
AWWA G200 / M5 / M77
Water Utility Best Practice
Distribution system O&M standards, distribution system requirements, and asset management guidance for water utilities.
NASSCO PACP/MACP/LACP
Pipeline Defect Coding
National standard for pipe, manhole, and lateral condition assessment. Powers collection system inspection workflow.
WEF MOP 44
Wastewater Maintenance Planning
Water Environment Federation Manual of Practice on collection system maintenance. Drives Work Order Agent scheduling logic.
SMRP Body of Knowledge
Reliability Engineering
Society for Maintenance & Reliability Professionals standards. Foundation for Predictive Agent's failure model library.
GASB 34
Infrastructure Financial Reporting
Governmental accounting standard for infrastructure assets. Required for $2.4B RAV reporting and depreciation schedules.
👁️
Vision Pro Interface
Apple Vision Pro spatial computing layer for Central San field operations. Hands-free AR asset inspection, overlays, and real-time data.
AR Asset Overlay
Point at any physical asset to see real-time condition score, work order history, and risk rating overlaid in spatial view.
Spatial Dashboards
Float Command Center KPIs in your field of view. Pinch to expand alerts, drag panels, resize charts hands-free.
3D Facility Map
Walk through a spatial 3D model of Martinez WWTP. Assets highlighted by risk score, tappable for full record.
Hands-Free Inspection
Voice + eye tracking for completing inspection forms in the field. Auto-populates work order on completion.
Live Agent Feed
Vision Agent surfaces real-time alerts as spatial notifications. Critical alerts pulse in peripheral vision.
Photo Capture
Spatial photo capture auto-tagged with asset ID, GPS, and timestamp. Attached directly to work orders and inspection records.
Capital Improvement Program
$980M, 92-line-item CIP through FY2033. 34 active projects. Managed by Capital Projects Division Manager Edgar Lopez.
Total CIP Budget
$980M
Active Projects
34
Spent to Date
$312M
FY2026 Authorized
$87M
Aeration Basin Diffusers & Seismic Improvements
DP 100061
Electrical Infrastructure Upgrade — Sub 55 & MCC Replacement
DP 100040
Solids Handling — Multiple Hearth Furnace Refurbishment
DP 100087
Recycled Water Expansion — Phase 3 Distribution
DP 100103
Collection System — Martinez Zone 3 Rehab
DP 100072
UV Disinfection System Upgrade
DP 100058
Cogeneration System — Turbine Overhaul & Controls Upgrade
DP 100091
HHW Facility Expansion & Modernization
DP 100114
Compliance & Regulatory
27 years of unbroken NPDES Platinum Peak Performance. Permit tracking, audit readiness, and regulatory reporting — all under 24-hour response SLA.
NPDES Compliance Streak
27 yr
Active Permits
14
Audit Response SLA
< 24h
NPDES Permit — Wastewater Discharge
Compliant
Primary discharge permit for Martinez WWTP. 54 MGD average, 240 MGD wet weather. Monthly DMR reporting to Regional Water Quality Control Board. 27-year continuous compliance record.
Recycled Water Title 22 Permit
Compliant
California Title 22 permit for recycled water distribution. Tertiary treatment requirements, sampling program, and public notification requirements managed by LIMS integration.
Air Quality — BAAQMD Permit
Compliant
Bay Area Air Quality Management District permits for cogeneration turbines, MHF incinerator, and emergency generators. Annual compliance certification current through FY2026.
SSMP — Sewer System Management Plan
Due FY2026
State-required SSMP update due FY2026. Collection system O&M program, overflow response, and capital planning sections being updated. Regulatory Agent tracking milestones.
GASB 34 — Infrastructure Reporting
Compliant
Annual infrastructure asset reporting per GASB 34. $2.4B replacement asset value tracked. Modified approach with condition assessment cycle. CPA audit support provided by Regulatory Agent.
HHW Facility — DTSC Permit
Compliant
California DTSC permit for Household Hazardous Waste collection and transfer facility. Annual inspection, manifest tracking, and waste stream reporting current.